My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58979
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:18 PM
Creation date
11/20/2007 6:04:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002009
IBM Index Class Name
Permit File
Doc Date
4/17/2002
Doc Name
County Commissioners Correspondence
From
County Commissioners
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PCPC <br />Re: SUP2001-001 AR2002 <br />4/10/2002 <br />Page 4 <br />12. The design of improvements to the chosen haul route and their construction shall be <br />completed prior to the applicant beginning hauling operations out of the pit, except for any <br />material used in the construction of the improvements. <br />MINING OPERATION PLAN <br />The applicant proposes to dry mine approximately 20 acres, in two 10-acre phases, from the <br />permitted site, over atwo-year period. The primary minerals produced will be sand and gravel, <br />for use as construction aggregates. Direction of mining will initially proceed from west to east, <br />and progress down to the shale bedrock. Topsoil wilt be stockpiled along pit perimeters for <br />later use in reclamation. Overburden material, estimated at 65,000 cubic yards, will either be <br />used as base course, or used to flatten slopes. Initially, topsoil and overburden will be stripped <br />using scrapers or dozers, and stockpiled. The aggregate will be mined with front-end loaders, <br />which will excavate the material and deposit it onto conveyors. Conveyors will then transport <br />the material to the Cortner Pit 2 site, for processing with a portable screen•and crusher.°-A} <br />maximum of~ 100 truck loads per day would be hauled from the site. <br />The operation will not affect groundwater quality on and off the site. On-site speed limits will be <br />used to control fugitive dust emissions, and city water will be used for dust control operations <br />along the roads and stockpiles. The applicant estimates approximately 2500 gallons per week, <br />using a 2500 water truck, will be needed for dust suppression. Noise levels from the operation <br />will fall within requirements for industrial zoning. <br />RECLAMATION PLAN <br />The entire pit area will be reclaimed as rangeland, for the beneficial end use. All reclamation <br />slopes will be mined at a slope of 3H:1 V. As the mining progresses, topsoil will be replaced at <br />a depth of three to six inches, and reseeding with grassland species will occur. Throughout <br />reclamation, the operator will periodically contact the Soil Conservation District for soil tests <br />and fertilizer recommendations, and maintain effective weed control. <br />Attachments: Exhibit 1 Letter of Request, d. 1/8/01 <br />Exhibit 2 General Location Map <br />Exhibit 3 Mine Site Map <br />Exhibit 4 Map of Adjacent Operations & Haul Routes <br />Exhibit 5 Comments, Public Works,-d.-3/26/2002- -~- - ~-,-- - - <br />c: Erick Reckentine, Land Manager <br />Rusty Cochran, Operations Manager <br />Dave Benbow, Public Works <br />Jim Stevens, Mined Land Reclamation Division <br />Jim Stevens, Division of Minerals and Geology <br />
The URL can be used to link to this page
Your browser does not support the video tag.