My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58865
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:09 PM
Creation date
11/20/2007 6:03:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Permit File
Doc Date
5/6/2002
Doc Name
Preliminary Adequacy Review
From
DMG
To
GCC Rio Grande Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The operator has committed in item 4, pa¢e D4 of their permit to the following: <br />Maximum of 360 pounds of explosive per borehole; <br />12 foot burden and 15 foot spacing; <br />Average 30 feet depth; <br />Minimum of 2 feet of stemming per borehole; <br />No blasting within 50 feet of buried telephone cable; <br />No blasting within 1,000 feet of a public road; <br />No blasting within 1,500 feet of a dwelling; <br />No blasting at night; <br />Seismic monitoring will be conducted in order to insure that the vibration limits are not <br />exceeded; <br />A pre-blast survey will be conducted on the only dwelling located within one mile of the <br />site. <br />The Pueblo County Special Use Permit requires the following <br />No blasting between 6:OOPM and 8:OOAM; <br />No blasting on Sunday <br />Staff Recommendations: <br />• For burden and spacing use a range of values, for example 10 feet to 20 feet for both <br />burden and spacing. <br />• For depth of borehole use a range of values, for example 10 feet to 40 feet. <br />• Commit to stemming more in line with accepted blasting guidelines (.7 x burden), or <br />possibly commit to a minimum of 25% to 30% of the borehole depth will be <br />stemming, or both, or provide rationale for reduced stemming; <br />• Consider performing apre-blast survey of all structures owned by people who have <br />written letters expressing concern over blasting. The pre-blast survey should be <br />conducted by a third party, and should be recorded photographically; on video tape; <br />and in written format. <br />• Consider seismically monitoring all structures above for the first one or two blasts to <br />establish a baseline and correlation with the main seismograph, so that future blasts <br />may be monitored using only the main seismograph. <br />• As the Division has received written communication that there is an historic adobe <br />structure north of the site, the operator should consider seismic monitoring of this <br />location for some period of time <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.