My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25904
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:30 PM
Creation date
11/20/2007 6:02:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001113
IBM Index Class Name
Hydrology
Doc Date
7/19/2004
Doc Name
Appl for Substitute Water Supply Plan
From
Ceryl Signs Engineering
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 5 <br />SEAHORSE RANCH WEST GRAVEL PIT WATER BALANCE <br />(All Values in Acre-Feet) <br />MONTH JA FE AP MA J AU SE OC NO DE ANN <br />DEMAND 1.7 2.6 5.1 9.31 12.81 15.9 14.81 12.7 9.9 6.9 3.4 1.9 97.46 <br />CREDIT 0.0 0.0 0.0 4.13 11.3 20.0 22.81 22.8 12.5 3.6 0.0 0.0 97.57 <br />DELTA -].7 -2.6 -5.10 -5.] -1.4 4.1 7.9 ]0.0 2.61 -3.2 -3.4 -1.9 0.00 <br />The water attributable to VCI's claim of Grilling No. 1 Ditch that is required for <br />replacing use at SRWGP will be left in the stream. The water in excess of this credit will be <br />diverted to Seahorse Pond. This water will be released when is it necessary to replace out of <br />priority depletions. <br />ACCOUNTING <br />VCI's accounting of its operation under this S WSP will be done on a monthly basis and <br />wil] be reported to the state. The monthly accounting will include: <br />• Weight of material mined from the site <br />• Estimated water removed with the material <br />• Estimated azea of exposed ground water <br />• Water stored in Seahorse Pond <br />VCI will report the product mined. The water lost with the product will be estimated by <br />using a factor of four percent of the product weight and will be an instantaneous loss to the <br />stream system. The water used for dust control will be measured and reported. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.