Laserfiche WebLink
FROM FAX N0. 17198464975 Sep. 02 2004 03:34PM P2 <br />Ptinrily will be given to maintaining l'unctionaliry of the ponds, kcepin; the primary and weep-bolas open. <br />Culverts were cleared of sedimem and will be cleared shat each precipitation event. Several ditches <br />breached during the August 4, 100 year storm event, due to sediment deposition blocking water passage. <br />These ditches wilt be opened and repaired as soon as conditions allow machine access. <br />The Fi118 down drain will be relocated to fire west edge of the fill. This will allow ics reconstrutaion to be <br />predominantly nnbed-roclt. Tht; eroded channel wil! be bxekfilled, graded then Beaded and mulched as <br />conditions allow. Damage w the od~er down drains will be given lesser priority as the damage is more <br />cosmetic, allowing the drains to continue function as desia ed. <br />Please contact me if yon have any questions, <br />Sincerely, <br />Ronald G. Thompson <br />Project Manager <br />MS;;IA Certified - Lnpoundment inspections <br />;. , . <br />