Laserfiche WebLink
<br />5. The permit application is not clear regazding the total area of the pit, and the size of the <br />pit area to be worked at any given time. Please provide an approximate timetable <br />describing the mining operation. Specifically, please address the relationship between <br />mining and reclamation during the 10-year mining period. ~ ~ ~~UC~ <br />6. Rule 6.4.5(f)(ii) requires that the applicant state the specific time of year the disturbed <br />area will be seeded. Please inform the Division the time of yeaz the reclaimed area will <br />be seeded. <br />Please be advised that the Mantle Pit #3 application may be deemed inadequate, and your <br />application may be denied on September 2, 1998 unless the above mentioned adequacy review <br />items are addressed to the satisfaction of the Division. <br />If you have any questions, please do not hesitate to call. <br />Sincerely, <br />Erica S. Crosby <br />Environmental Protection Specialist <br />cr. Cazl Mount, DMG <br />c:\esc\M98047\9806? 2 <br />