Laserfiche WebLink
(Table Continued) <br /> Unit Cost Cost <br />Aspect Reclamation Operation Quantity Units ($) ($) <br />G. Settling Basin <br /> 1. Will fill with water <br />H. Access Road <br /> 1. To remain following reclamation <br />I. Topsoil and Overburden Stockpiles <br /> 1. Material removed for other <br /> Aspects <br /> 2. Seed and mulch 0.5 Ac 800 400 <br /> 3. Reseed 20% 0.1 Ac 800 80 <br />J. Employee Facilities <br /> 1. Scarify compacted ground 0.5 Ac 50 25 <br /> 2. Replace topsoil, 6" x 0.5 acres 400 CY 1.25 500 <br /> 3. Seed and mulch 0.5 Ac 800 400 <br /> 4. Reseed 20% 0.5 Ac 800 400 <br />K. <br />Total Disturbance Costs 101,492 <br />Contractor Mobilization/Demobilization (8%) 0.08 8,119 <br />Overhead (18.5%) 0.185 20,278 <br />Administration (5%) 0.05 6,494 <br />Total Pro osed Financial Warran 136,383 <br />Disturbed Acreage 9.25 <br />Financial Warranty per Acre 14,744 <br />25'" Avenue Site <br />OMG L2 Permit <br />Page 10 <br />