My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58702
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58702
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:59 PM
Creation date
11/20/2007 5:58:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT G WATER INFORMATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Echibil G CMLRB 112 Permit Application <br />Agile Stone Systems, Inc. <br />• Surface water diversions and consumptive uses, by yeaz and quarter, are given in <br />Columns (2) and (2a) of Table 3. These values are based upon the average annual values <br />given in Table 1 for each of these water budget components. <br />Rechazge to the alluvial aquifer (Column (3))is computed from the difference between <br />water diverted and water consumed values of the preceding columns. If Twin Lakes <br />water is diverted to provide additional recharge, as indicated by a value in Column (7a), <br />that value is also added into Column (3). <br />Retum flows to the Arkansas River (Column (4)) are then computed using the v/Qt <br />values of Table 2, assuming that the recharge rate is constant through a quarter and <br />applying the principal of superposition. <br />Column (5) of Table 3 then gives the quarterly depletive effect of mine operations on the <br />River, computed as the difference between diversions (Col.(2)) and return flows <br />(Col.(4)). This depletive effect is then exactly balanced with Twin Lakes replacement <br />water (shown in Col. (1)) to provide a zero net accretion or depletion on the River (see <br />Col.(6)). <br />An accounting of Twin Lakes share water is given in Columns (7) through (10). This <br />accounting assumes that on November 1 of the first year, 1.417 million gallons (the <br />estimated net amount after subtracting river transit loss; see Table 1 and Col (10)) is <br />• placed into Agile's account. Thereafter, this amount is increased to 1.79 million gallons <br />since Agile does not consume the full 1.417 million gallons in the first year and unused <br />water is allowed to carry forward each year as a credit to the water share owner so long as <br />the carry forward and new year water allotment does not exceed the storage capacity of <br />the water reservoir. This maximum amount for Agile's 5 water shares at Parkdale equals <br />about 1.79 million gallons. Beginning balances are given in Col. (7), and are computed <br />from the Ending balance of the previous period (Col. (8)), plus Twin Lake credit <br />(Col.(10)) for that period. <br />Any beginning amounts in excess of the allowable storage volume in Twin Lakes (1.1 <br />acre-feet per share x 5 shares = 1.79 million gallons) is shown as "Excess" water in <br />Column (9), and the beginning amount (col.(7)) is reduced to 1.79 million gallons. This <br />occurs in Quarters 3, 7, 11 and 15. Ending balances are given in Col. (8), and are <br />computed from Col. (7) minus Col. (5) [Begin -Depletions, or Begin -Replacement]. <br />(The physical storage limit of 1.1 acre feeUshaze was confirmed 12/11/97, Personal <br />Communications with Alan of The Twin Lakes Reservoir and Canal Company and Steve <br />Kastner, Water Division 2, Office of the State Engineer.) <br />The "Excess" water not used by the applicant flows down the Arkansas River, to the <br />benefit of other water users. During the five year simulation period, the water balance <br />computations show that the Arkansas River benefits from the planned operation of the <br />Project, with the annual benefits varying from about 512,000 gallons in Year 1 (Quarter <br />• 2) to about 10,000 gallons in Year 4 (Quarter 15). <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.