Laserfiche WebLink
<br />~~ CUS7 ESTIMATING PROCEDURES <br />1. MOD111=e[100 eOd DemOD1112ailOn $ 287+518 <br /> (10- oC Itemb 2 cnrougn S) <br />2. St[ucturel Deolition $ 249,500 <br /> (ACLUdl C08Lb) <br />3. Beckfllling end Gceding $ 2,524,609 <br /> (Actual Cubic Yard Costs) <br /> Inc. Above <br /><. Replacing Topsoil $ <br /> (Actual Cubic Yerd Coeca) <br />5. Seeding, Pertllizatlon, Mulching # 213.200 <br /> (Actual Acreage Coste) <br />6. Contingencies ~ 327,483 <br /> (10- of Items 1 through 5) <br />7. Rard Coats # 3,602,310 <br /> (Subtotal of Items 1 through ti) <br />e. Engineering Coats # 198,127 <br /> (- of Line 7, see Graph II-2) 5.5% <br />'•9. Reclamation Management and Administration # 108,069 <br /> (- of line 7, see Graph II-3) 3~ <br />10. Profit and Overhead # 493.516 __ <br /> (\ of line 7, ace Graph II-4) 13.7% <br />TOTAL COST ESTIMATE POA BONDING PURPOSPS # 4,402,022 <br /> <br />-121- <br />