Laserfiche WebLink
SUnw1RY sHEET <br />~ ooili:etion end DemoDilfze_fon ~ 287,518 <br />--• lOt of line trams 2 th[ougn 5 <br />2. Demolition $ 249,500 <br /> Buildings and Pecilltlea $ 147,500 <br /> Railroad Sputa end Loops } <br /> <br />Portals and Shaft^ } <br /> Thick Slnbs <br /> Conveyors S 11,500 <br /> Road [ Pnrking Surtncing ~ $2,500 <br /> Culverts end Bridges { <br /> !ante Linea 5 2,000 <br /> Power Lines ~ 6,000 <br />3. Beckf1171nq end Crading # 2, 524,609 <br /> Backfilling Pic^ A & B Pits $2+524,609 <br /> Hi9hvn11 Reduction # <br /> Spoil Ridge Reduction # <br /> Pinal G[eding { <br /> Roads L Railroads <br /> Closing Portals and Shafts $ <br />~. Replecinq TOOe011 * (Tnr in ahn,ral <br />5 Revegetetion <br />656 @ $325/A ~ 213,200 <br /> Seedbed Preparation <br /> Pertllizing <br /> Seeding <br /> Planting, Trees i Shrub^ { <br /> Hulching ~ <br />6. Contingenclea # 327,483 <br /> 10 t of Items 1 through S , <br />_ ~., Ha[d Costs # 3,602,310 <br /> Summation of Items l throogh 6 <br />B. Engineering Coats # 198,127 <br /> Percentage of Item 7, Ptom Graph 11-2 (5.51 <br />9. Reclamation Management and Adminiatretlon $ ln~.nhg <br /> Percentage of Item 7, from Graph 11-3 (3. i • <br />10. Profit end Overhead # 493,515 <br /> Percentage of Item 7, from Graph 11-~ Q3.7) <br />11. 7ota1 Cost Eatimnte foc Bonding Purposes # 4 ,402,022 <br /> Summation of Items 7, 8, 9, and 10 " <br />. Engineering Hewa Record Coa t Index Data <br />~~~ <br />-120- <br />