My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58558
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:49 PM
Creation date
11/20/2007 5:55:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001017
IBM Index Class Name
Permit File
Doc Date
7/2/2001
Doc Name
SLURRY WALL & CLAY LINER L G EVERIST INC LOHMANN PIT FN M-2001-017
From
DMG
To
GREGG SQUIRE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />from the surrounding ground water system. Shale substrate will also be used to <br />construct the clay liner in Area B. <br />2.11 SITE PREPARATION <br />Site preparation will include clearing plant materials, stripping and disposing of the plant <br />materials so the slurry wall and clay liner can be constructed for water storage areas. <br />The Applicant (or a qualified contractor selected by the Applicant) will determine the <br />amount of clearing to prepare the site, in accordance with this section of the <br />specifications for construction. <br />The ground surface where construction of the slurry wall and in-fill areas for the clay liner <br />(see Reclamation Plan, Exhibit F) will be cleared as directed by the Engineer (Note: the <br />Engineer is any qualified person(s) chosen by the Applicant to oversee the clay liner and <br />slurry wall construction). These surface areas will be cleared of all trees, stumps, <br />exposed roots, brush, rubbish and other material determined objectionable by the <br />Engineer. <br />The fill areas will be stripped to a sufficient depth in order to remove all unsuitable <br />materials, such as boulders, loose rock, debris, topsoil, organic matter, stumps, roots <br />and other objectionable materials that are incompatible with the construction of the slurry <br />wall and clay liner, and the specifications for construction. <br />The plant materials from the site preparation will be removed from the construction site <br />and disposed of in an appropriate manner. Disposal piles will be located such that they <br />do not interfere with drainage sources (natural or on-site), mining operations, or <br />operation of the reservoir. <br />
The URL can be used to link to this page
Your browser does not support the video tag.