My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25803
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:26 PM
Creation date
11/20/2007 5:55:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978091UG
IBM Index Class Name
Hydrology
Doc Date
4/26/2007
Doc Name
Stormwater Managment Plan
From
Gault Group Inc.
To
Water Quality Control Division
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golden Wonder Mine <br />DBMS Mine Permit No M-1978-091 <br />Storm Water Management Plan <br />needed, GGI is responsible for identifying the appropriate management <br />practice and submitting ail necessary information for this S WMP. <br />c. Preventive Maintenance <br />Preventative maintenance is achieved with the continuous oversight of mine <br />activities to assure environmental compliance. GGI personnel have been <br />delegated the responsibility for these activities and will take an active role with <br />mine activities to assure environmental protection. Apart of the oversight <br />responsibilities will be to review the preventative maintenance requirements for <br />in-place management practices that control stormwater. Any management <br />practice that begins to show sign of erosion or failure will be actively maintained <br />(e.g, the perimeter pad berm, or toe of waste rock slope channel). The integrity of <br />these features will be constantly monitored (at least four visits per year) as part of <br />the ongoing routine monitoring as required by the mine reclamation permit. <br />Maintenance of pollution release prevention measures will occur as follows: <br />• Mine machinery and vehicles will be maintained in good operational order in <br />order to prevent fuel leaks. <br />• The use of solvents and lubricants will be confined to the workshop where <br />containment of any incidental spills can be accomplished. <br />• Potential ARD generated from the waste rock will be controlled with the use <br />ofpad-related stormwater BMPs <br />• Potential stormwater sediment will be prevented with the constant <br />maintenance and upkeep of the access road and pad stormwater management <br />practices <br />d. Good Housekeeping <br />Good housekeeping measures are a necessity for the orderly and safe activities at <br />the mine. A temporary building has been established for worker convenience, <br />changing room, break room, manuals and other site documentation, while a <br />second building (partially open) has been set aside as a work area for maintenance <br />activities. Tools, storage, lubricants/degreasing solvents etc. are all appropriately <br />stored at this building. Other materials required for mining are stored out and <br />away from the working area of the pad. Similarly, the crusher exists along the <br />perimeter of the pad to allow for ease of ore transfer. <br />Housekeeping is a routine component of the mining schedule. Daily routines <br />require that all refuse be discarded and transported off the mine. GGI personnel <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.