Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />TOTAL <br />MA OUNT UNIT COST/UNIT COST <br />1. Scarify 58,080 <br />2. Plac® 4" topsoil, 522 <br />haul (50@'>, dump, <br />final grade. <br />3. Seed, fertilize, mulch 14 <br />plant site and haul roads. <br />SUBTOTAL <br />GRAND TOTAL <br />SY .15 f 8,712 ~ <br />MSF 35.00 f18,270 <br />AC 500.00 f 7,000 " <br />f33, 982 <br />fi16,932 <br />i _~ <br />