Laserfiche WebLink
1 <br />1 <br />1 <br />i <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />EXHIBIT L <br />RECLAMATION COBTB <br />Reclamation costs are calculatated by pra,7ecting the possible <br />worst case scenario during which default might occur. Mining <br />will progress in 15~ acre maximum increment a. Therefore, at any <br />one time 15 acres may be mined, another 15 acres stripped of <br />topsoil, and three sides of shoreline exposed at l:l~slope. The <br />sfte of the concrete and processing plants would~~also require <br />reclamation. <br />It is proposed that this operation be covered by a 1116,932 <br />financial warranty for reclamation casts. <br />Minino Area <br />1. Shoreline exposed <br />(2600 1. P.) - Fill <br />to 3e1 for 15 vertical <br />Peet and 2:1 for 12 <br />vertical feet and haul <br />(300'), dump, roughgrade. <br />2. Plants at shoreline. <br />3. Topsoil at stripped <br />area, haul (500'), <br />dump, final grade. <br />4. Seed, fertilize, mulch <br />at stripped area.' <br />5. Place 4" topsoil on <br />bank, load, haul (500'), <br />dump, and fine grade. <br />6. Seed, fertilize, mulch <br />at shoreline. <br />SUBTOTAL <br />TOTAL <br />AMOUNT UNIT COST/UNIT COST <br />moo`` <br />80,600 COY .80 i64,4B0. <br />'180 EA 25.00 t 4,500\ <br />~ M <br />~ <br />~ <br />* <br />MSF~' 35, 00 <br />~ 2, 285.=~~;:' <br />~ <br />bH~ <br /> ~ <br />~ i <br />3 5 AC 500. 00 c <br />~ 7, 500 <br />91 MSF 35.00 t 3, 1 B5 <br />,~ <br />2 RC 500.00 f 1, 000'' <br />X82,950 <br />~ _~ <br />