My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58459
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:44 PM
Creation date
11/20/2007 5:53:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997086
IBM Index Class Name
Permit File
Doc Date
2/6/1998
Doc Name
MEMO SILOAM STONE BEDROCK MINE PN M-97-086 PERMITTING SYNOPSIS
From
DMG
To
MICHAEL B LONG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />This is a 1 12 construction materials application DMG file # m-97-086. <br />The application was submitted on September 30 and called complete on October 6, 1997 <br />with a decision date of January S, 1998. <br />The last day for the cornment period was November 21, 1997. <br />Two objections were received; <br />The first was received on November 12, 1998 from Red Creek Ranch. <br />The second was received on November 21, 1998 from Kelly Park, a surface landowner. <br />The office also received comments from [he State Engineers Office, Department of the Army. <br />and San Isabel Electric Assn. All were notified of conferences and none were present during the <br />informal conference. <br />An infornal conference was held on December 15, 1997 in Pueblo. <br />The preliminary adequacy letter was sent out on December 23, 1997. <br />The first of three extensions was received on December 30, 1997 and requested an extension <br />until January 9, 1998. <br />Responses to these the initial PAR were received on January 7, 1998. <br />The second extension was received on January 9, 1998 requesting and extension until January <br />12, 1998. <br />The division made a decision [o recommend this application for approval, with stipulations, on <br />January 12, 1998. <br />Pre-Board hearing scheduled for January 23, 1998 and appearance before the Board for a final <br />decision will be held during the February Board Meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.