Laserfiche WebLink
The only building that might be constructed in the foreseeable future is replacing the <br />one on the pad that was destroyed by a plane crash. It will be constructed to house and <br />repair equipment used on the site with perhaps a small office complex. It will be built in <br />compliance with all current County codes and after submitting a proper TR. <br />Rule 6.4.6: Where sized material (limestone or dolomite) is mined and the extent of <br />the disturbance will dictate if a new or amended Reclamation Plan Map need be <br />submitted. If the disturbance is great, this definitely will be the case, however, as it is <br />quite possible that any mining will be another cut from the face, the overall appearance of <br />the premises may only suffer minor change. <br />Rule 6.4.14: [ am meeting with the Forest Service the first of next week and will work <br />out something acceptable to complete the permitting process. <br />Rule 6.4.19: I have already addressed this item. <br />Will be in touch just as soon as the final(?) submittals are ready. <br />Respec <br />//LYi L• ~ ~/,~ .~ <br />cc. Johnny G. Bowers CLC <br />