Laserfiche WebLink
Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dumF 0.380 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : No adjustment -factor not applicable 0.000 (Cat HB) <br />Stockpile: ConveyorordozerpiledlOR.highorless 0.010 (CatHB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HBJ <br />DumptargeL Nominal target 0.000 (Cat HB) <br />Net cycle time adjustment : -0.070 minutes <br />Adjusted loader cycle time (total time per loader pass) : 0.310 minutes <br />Net load time per truck ` : 2.845 minutes <br />TfUCk CVCIe Tlrrle : ' Eulk of 1st loatler cycle completed During Vurk ezchange if adj. loatler qGa time <exchange time <br />Truck exchange time ": 0.50 minutes........ Adjusted for site altitude : 0.500 minutes <br />Truck load time: 2.845 minutes........ Adjusted for site altitude : 2.845 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.900 minutes <br />"set at 0 d exchange time < edj. loader tyGe time (truck exchange completed during ist loetler tyde) <br />Truck travel (haul & return) time: <br />Haul route <br />Road condition : NA-user <br />Road <br />segment N Haul distance <br />(miles) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(miles/hour) Travel time ` <br />(minutes) <br />1 1 NA-user NA-user NA-user 15 2.400 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time ": 2.400 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />minutes <br />• travel time sham for each segment includes accelereticNdeceleration adjustment Retum time": minutes <br />"total haul and return time shown includes altitude adjustment Total truck cycle time : 6.645 minutes <br />Loading tool unit production : 209.87 LCY/hour...... Adjusted for job effciency : 174.19 LCY/hour <br />Truck unit production : 105.64 LCY/hour...... Adjusted for job efficiency : 87.68 LCY/hour <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. trucks/loader : 2 trucks <br /> Adjusted hourly truck team production : 175.37 LCY/hr <br /> Adjusted hourly single truck loader team production : 174.19 LCY/hr <br /> Adjusted hourly multiple truck loader team production : 174.19 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 39.58 Hours <br />Unil cost : $1.725 /LCY Total job wsl : $11,890 <br />