My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58363
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:39 PM
Creation date
11/20/2007 5:50:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />Agency or organization name : CDMG <br />294 State :Colorado PermiVjob # : C-80-007 <br />11/24!2006 County:Gunnison Abbreviation :none <br />TAK Site :West Elk Mine Filename :0007-294 <br />Permit or otherjob action :Permit Renewal <br />Task description :Distribute St0 <br />HOURLY EQUIPMENT COST <br />on Sylvester G. Rtl. extension) <br />Shift basis : 1 per day <br />Trucklloader feam -Truck :Generic 10-12 cy, 6x4 <br />-Loader :CAT 933C <br />Support equipment -Load area :CAT 14H <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 trakload grader NA NA NA <br />Utilization-machine : 99 100 100 NA NA NA <br />-Ripper attachment: NA 20 0 NA NA NA <br />Ownership cosuhour: $16.84 $10.89 $40.73 NA NA NA <br />Operating cosuhour: $25.68 $16.97 $45.93 NA NA NA <br />Ripper op. cesVhour : NA $0.32 $0.00 NA NA NA <br />Operator cesVhour : $21.75 $32.53 $24.47 NA NA NA <br />Unit subtotals : $64.28 $60.70 $111.13 NA NA NA <br />Number of units : 2 1 1 0 0 0 <br />Group subtotals : Work : $189.26 Support : $111.13 Maintenance : $0.00 <br />Total work team cosuhour : $300.39 <br />;, <br />;: •:. <br />.:. :< ,. <br />MATERIAL QUANTITIES ~ ~~ ~ ~~ <br />Initial Swell Loose <br />volume: 6,895 LCY factor: NA volume: 6,895 LCY <br />Material weight : 1,600 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Top Soil Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 22.12 LCY Adjusted volume': 12.00 LCY <br /> Final truck volume based on number of loader passes : 11.70 LCY <br /> vuck vowme eaw~aa to ~: exce ed ratetl ~ywea a ~apea vaume <br />Loading Tool Caoaciri : Job Conditio Corrections : Site altitude (ft.) : 6,900 <br />Raled capacity (nom. heaped) : 1.300 LCY Truck Loader Source <br />Descr.:Other- soil, boulders, roots (80.100%) Altitude adj.: 1.000 1.000 /Cet HE <br />Bucket fill factor : 0.900 Job efficiency : 0.830 0.830 (1 shifUde <br />Adjusted bucket capacity: f.t70 LCY Net correction : 0.830 0.830 <br />sheet 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.