Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 207 <br />Date : 08/31/2006 <br />User : TAK <br />State :Colorado <br />County': Gunnison <br />Site :West Elk Mine <br />Permitfob#:C-80-007 <br />Abbreviation :none <br />Filename :0007-207 <br />Agency or organization name :CORMS <br />Permit or other job action : Regrade mud pifs associated with MR-212 <br />Task description :Replace topsoil on pads and roads from MR-287, 270, 273, and 275 <br />HOURLY EQUIPMENT COST <br />Basic machine : Caf D9R - 9SU (2005) Horsepower ; 405 <br />Blade type :Semi-Universal <br />Attachment no. t : ROPS Cab Shift basis ; 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cosUhour : $818.13 <br />MATERIAL QUANTITIES - _ _ .. <br />Initial Swell Loose <br />volume : 19,365 CCY factor : 1.125 volume : 21,788 LCY <br />Source of estimated volume :MR Applications/Division estimate <br />Source of estimated sweN factor ;CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs1LCY <br />Weight description <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) <br />Unifcost: $0,366 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net carcection : 0.45 <br />Adjusted unit production <br />Adjusted Fleet praduction <br />HB) <br />558.21 LCY/hr <br />,232.86 LCYIhr <br />Total job time : 9.75 <br />Total job cost : $7,98. <br />Hours <br />