Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action :Permit Renewal RN-05 <br />Task description :Regrade drill pads and roads associated with MR-267, 270, 273, and <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />OperatingcosUhour : $98.84 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cosUhour : $818.13 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 40,905 CCY factor : 1.165 volume : 47,654 LCY <br />Source of estimated volume :Division estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION ~ ~ ~~ Job Condition Correction Factors ~~ Source ~~~ <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 6,600 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.36 <br />Adjusted unit production : 441.76 LCY/hr <br />Adjusted fleet production : 1,767.04 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 26.97 Hours <br />Unit cost : $0.463 ILCY Total job cost : $22,064 <br />