My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58356
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:38 PM
Creation date
11/20/2007 5:50:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1989074
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05.4(2)(d) TOPSOIL REDISTRIBUTION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />2.05.4(~~LTopsoil ~edistributiouucoutinued~ <br />some problem generating enough topsoil for redistribution because of the rocky surface and <br />steep slope as discussed in Rule 2.04.9, however the applicant is agreeable to acquiring <br />offsite topsoil to so]ve this problem if it occurs. The Phase 2 reclamation includes <br />redistribution of topsoil on the two coal stockpile azeas, the s]opes of the sediment pond <br />having been graded, topsoil redistributed and seeded soon after completion. <br />As previously set forth additional soil sampling will take place and nutrients added to insure <br />plant growth if needed. <br />The applicant agrees to a topsoil cover of 15 inches over the entire disturbed surface, <br />however it must be understood the cover will consist of predominately "B" soil since the <br />accumulation of "A" soil is expected to be much less. <br />Contour furtowing will be considered to avoid future problems. <br />• The entire disturbed area was retopsoi]ed except for the sediment pond and the access <br />road, which are to be left as permanent structures. <br />All work was completed according to the approved plans. Proper thicknesses were <br />achieved without importing topsoil. All slopes were 4H:1 V or less. As of the end of <br />1995, the sites were well-vegetated approaching vegetation success criteria. <br />-2- <br />. Revised for permit renewal ]]117/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.