Laserfiche WebLink
35 <br />• 1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />C~ <br />21 <br />22 <br />23 <br />24 <br />25 <br />that manner understand what the optimal replacement <br />depth will be. <br />The Division feels that 18 :Lnches, <br />given our past experience, is probably opt:Lmal so we <br />have asked them to salvage at least that much <br />material in case the test plot information does <br />indicate that that is the depth we need to have. <br />And, finally, the reclamation cost <br />estimate -- Battle Mountain has submitted en cost <br />estimate. However, the reclamation plan h<as been <br />very dynamic for the last couple months. Things are <br />changing and, like I said, we just have concurred <br />with the buttress idea, and these sorts of things <br />need to be worked into the reclamation cost: <br />estimate. <br />We do not have a final figure yet, <br />although it is safe to say that the minimum amount of <br />financial warranty to be required will be about one <br />and a half million dollars. We will work with Battle <br />Mountain and come up with a final figure over the <br />next few weeks, but it will probably take a little <br />bit of time to get a complete estimate donee for the <br />site. <br />MR. HOLDER: I'm not clear on <br />what part of this reclamation might be donee <br />