Laserfiche WebLink
23 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />• 13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />• 24 <br />25 <br />which I indicated previously, and again the company <br />has engineered it such that it will be a 90-degree <br />type crossing and should allow for safety sand visual <br />concerns at that point there. <br />Each of the various facilities such as <br />the heap, the pads -- I'm sorry -- the heap, the <br />ponds, the pits, and the waste disposal areas have <br />upstream diversions which will route upstream flows <br />away from these facilities and into sediment traps <br />(which are located beneath each of the major <br />(facilities at the site. This should minimize <br />erosion into and off of each of these areas. <br />In addition, the company has committed <br />to providing a detailed emergency response plan prior <br />to introduction of toxic or dangerous chemicals onto <br />the site which would include detoxification, <br />reaction, who would be contacted in what sorts of <br />situations and such like this. <br />I would like to move into the <br />reclamation plan at this point. <br />The proposed postmining configuration <br />or use of the site is grazing and wildlife habitat. <br />I'll just go over the reclamation of each of the <br />major facilities and discuss maybe in broader terms <br />the entire reclamation concept for the site. <br />