Laserfiche WebLink
21 <br />• 1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />• <br />• <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />will be amended with bentonite to achieve the <br />permeability levels that we are interested in <br />seeing over there. <br />The company has committed to salvaging <br />sufficient topsoil to cover each of the facilities <br />with 18 inches of topsoil upon reclamation, and again <br />just for clarification, the facilities I'm talking <br />about are the waste disposal areas, the east pit and <br />the heap area as well as the roads and any other <br />associated disturbances. <br />There will be a haul road crossing of <br />the Rito Seco up in this area here (indicating). <br />This has been engineered so that the configuration <br />would be three side-by-side 54-inch culverts <br />underlying a Swale low top crossing. <br />The 54-inch culverts would pass <br />(normal flows. In the event of an extreme flow it's <br />(been designed so that the culverts would continue to <br />(flow and, of course, the stream would come in a <br />(controlled manner over the Swale and continue on <br />idownstream. <br />i MR. HOLDER: How far is the wall of <br />(the pit from the stream itself? <br />MR. RENNER: In this area he:r.e <br />(indicating), Davis, it's about a hundred feet. <br />