Laserfiche WebLink
12 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />S <br />9 <br />10 <br />11 <br />12 <br />• 13 <br />i 14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />i 21 <br />22 <br />23 <br />• 24 <br />stability issues, geotechnical issues, groiundwater <br />hydrology and general mining engineering. <br />I would like to direct the <br />Board's attention over to this small map over <br />here (indicating). 2'11 be referring through my <br />discussion to a number of facilities, and I'll run <br />through the facilities from my right to my left <br />right now just so you are more or less familiar, <br />and I'll be referring back up here on occasion. <br />Starting at my right, which would be <br />the east portion of the permit area -- north is to <br />the top -- would be the east pit area, a waste rock <br />disposal area, the west pit area, three waste rock <br />areas running from east to west, a south waste rock <br />and tailings disposal area, a conventional mill <br />facility, cyanide heap leach facility, and then <br />a borrow material area. <br />The best way for me to describe what <br />is proposed is to go through the mining operation as <br />I understand it from the permit application, step by <br />step through the operation beginning with the initial <br />excavation of the east pit and ending up with <br />reclamation. <br />The east pit area over here <br />25 (indicating) is approximately twenty acres in size. <br />