Laserfiche WebLink
• Colorado Yampa Coal Company will maintain fugitive duet control <br />measures as an integral part of all mining and reclamation <br />activities. The palliative measures which CYCC will implement in <br />connection with the proposed mining and reclamation activities at <br />Energy Hine Po. 3 are summarized below, <br />Eoads <br />Colorado Yampa Coal Company will employ a duet suppression <br />program for the haulroad, A mine eater truck will be used to <br />periodically vet down any dusty conditions. During dry months, a <br />chemical duet suppressant may be used in addition to watering. <br />• The roads at the surface mine will be maintained by a motor <br />grader or similar equipment to remove any coal, rock, soil, or other <br />debris. Smooth and clean road surfaces are essential for minimizing <br />duet and alloying efficient use of mining equipment, <br />No travel of unauthorized vehicles will be allured on anything <br />other than established roads. Employee and mine vehicles will be <br />restricted to the roads established for mining activities. Speed <br />limits will be set at 35 miles per hour for all vehicles and <br />equipment operating on roads within the proposed permit area. The <br />aforementioned measures will serve to effectively control air <br />pollution and provide a comprehensive air quality control program. <br />• <br />2.05 - 113 <br />