Laserfiche WebLink
<br />iii iiiiiiiiiiiu iii <br />STATE OF COLORADO <br />DEPARTMENT OF TRANSPORTATION <br />Region 3 <br />222 South Sixth Street, Rm. 317 <br />Grand Junction, Colorado 87501-2769 <br />(970) 248-7206 Fax (970) 248-7254 <br />March 20, 1996 <br />Steve Shuey <br />Division of Minerals of Geology <br />Department of Natural Resources <br />1474 Main Ave. <br />Durango, CO 81301-5182 <br />RE: Spring Creek Pass Pit M-96-007- Preliminary Adequacy Review <br />Dear Mr Shuey, <br />The following are responses to your adequacy review. <br />OT <br />rs_rs~~ <br />~r_~. <br />r_~ <br />~;_ (~~IF:Ft <br />C~°~~~iG <br />MAR 2 ~:;, <br />....:J <br />p{lR1Ro0 Flofd OtftC~ <br />OMIOIOR of Mir©ral; ~, Qcolopy <br />EXHIBIT C - A revised Exhibit C with pre-mining location and contour map is attached. <br />CDOT acknowledges that the fence is a permanent manmade structure. The fence on the <br />southerly boundary was selected as a physical pit limit boundary. CDOT does not intend <br />to disturb the fence nor excavate a highwall close enough to compromise its stability. <br />CDOT will not excavate a highwall within 40 feet of the pit limits. <br />2. CDOT intends to use this pit intermittently as CDOT and USFS surfacing contracts <br />require. The schedule for intermittent use depends upon future need and funding and is <br />not available. CDOT is aware of the requirement to report the status and condition of the <br />pit on a yearly basis to the Division of Minerals and Geology. It is our intent to store only <br />crushed aggregates and topsoil within the pit during periods of temporary cessation. The <br />entire disturbed area including topsoil piles (but excluding aggregate stockpiles) will be <br />temporarily seeded if not anticipated to be used during the following construction season. <br />Erosion control berms will be installed every fall. The condition of the pit in regard to <br />erosion and surface runoff will be monitored and reported to the Colorado Department of <br />Health as required by our Stormwater Management Plan twice each year. <br />EXAiBIT D - A revised Exhibit D with a mining plan map is attached. <br />According to the map provided with the permit the existing highwalls are approximately <br />80 fee[ from the new pit limit. CDOT intends to monument the pit limits by installing <br />metal fence posts on each corner and on each line at no more than 200 feet intervals. <br />CDOT will not excavate highwalls within 40 feet of the defined pit limits. If necessary the <br />40 foot limit will be marked. <br />