Laserfiche WebLink
<br />Exhibit A - LeKal Description <br />A 51 acre tract of land of which approximately 1$,Z acres are <br />located in the NF4 of the SW4; 15,9 acres in the NW;, of the <br />SW4; 1.0 acres in the SE4 of the SW'%; and 15.9 acres in the <br />SW%, of the SW ~, all in Section 31-T23S-R56W of the 6th P.M. <br />in Otero County, Colorado. <br />Exhibit B - Index hlap <br />Please see an excerpt of the USGS 7.5 Minute Quadrants providing <br />a composite map taken from maps identified as Rocky Ford and <br />Hawley, Colorado and submitted as Exhibit B-1. <br />Exhibit C - Pre-mining and Minim Plan Maps <br />Please see Exhibit C-1, the Pre-mining Map and Exhibit C-2, <br />the A9ining Plan Map submitted with this Application. <br />Exhibit D - Minim Plan <br />This Application incorporates all of the area presently permitted <br />as a Limited Operation, MLRB File ~~79-7 and all of the area <br />included under a Special Operations Permit, MLRB File ;'k M-85-]79. <br />In addition, another area of 31 acres is added to the above <br />permitted areas creating a new Regular Operation application <br />with a combined total of 51 acres. Conversion of the several <br />permitted areas and related release of the posted sureties <br />will be requested simultaneously with completion of the appli- <br />cation process for the enlarged operation. <br />Excluded from this Application is an adjacent 14.5 acre tract <br />that has been permitted by Otero County for a permanent indust- <br />rial site for a concrete and asphalt hot plant. At present the <br />site is used as a stockpile area and blending operation for <br />aggragate materials trucked to the site from Lamar, Colorado <br />and other locations other than tl~e immediately adjacent mining <br />operation. The industrial site will continue to be used in <br />the same manner long after the immediately adjacent resource is <br />exhausted. The industrial site will be fenced separately. <br />The proposed mining activity on the 51 acre tract will generally <br />proceed in the same manner as presently permitted. The initial <br />Limited Operation area has been nearly mined out and will become <br />the first area planned for final grading and reclamation in 1986. <br />A small portion of the area near its west boundary will continue <br />to be used in the conduct of the mining and processing operation. <br />Exhibit C-2, presents a five phased operation with each phase <br />encompassing about 7 to 9 acres. Depending upon the demand for <br />material, it is expected that each phase will be fully mined in <br />two years from the start and late in the second year be graded <br />and prepared for final reclamation. It shall be the goal of <br />the mining plan to limit disturbance to approximately 10 acres <br />at an }' given time. <br />