Laserfiche WebLink
FINAL TRANSPORT <br />Method of Transport of Product (Check One); ~ Haul Truck on paved roads iJ Rail Car; <br />Other (describe) <br />N/A <br />Capacity of Transport Vehicle (tons or yd3): Haul Truck; <br />Description of Controls: <br />Description of Route: <br />ROAD MAINTENANCE <br />Estimated Number Hours of Grader Work Required on Unpaved Roads <br />Rail car <br />N/A (Daily) <br />EXPOSED AREAS <br />Estimated Total Disturbed Acreage Subject to Wind Erosion: <br />Time before revegetation: not revegetated Months <br />3.0 acres <br />(Annually) <br />Estimated Total Acreage Required for Tailings or Waste Disposal: <br />Description of Controls and Reclamation Plan: Will be reclaimed with rest of mine at time . <br />Remarks: This APEN is for Golden Eagle Mine surge pile. Coal is trucked from Golden <br />Eaa1e to surge pile and dumped. Using front end loader, coal is dumped on grizzly and <br />conveyed over to raw coal stockpiles to go into coal ~dashinq. <br />Signature of Person Legally Authorized to Supply Data: ~((,~,~'Jl~~, <br />Typed or Printed Name and Title: David M. stout <br />Date: January 16, 1987 <br />Environmental Coordinator <br />'~- <br />