Laserfiche WebLink
LOADOUT FROM STOCKPILE TO PROCESSING <br />• ^escription of Loadout (bulldozer, conveyor, etc.): Front end loader to grizzly <br />Description of Controls (watering, chemicals, etc.): None <br />Loadout schedule: 125 tons/hour 6.4 <br />125 tons/hr max; 800 tons/day max; 50,000 tons/year max <br />PROCESSING <br />hours/day 62.5 days/year <br />Tons/year of Material Subject to: N/A Primary Crushing; <br />Tertiary Crushing: Recrushing; <br />Secondary Crushing <br />Fines Mill <br />Screening; $ Moisture Content (of raw material) <br />$ Moisture Content (of finished material) <br />Description of Controls (bagfilter, spray bars, etc.): <br />CONVEYOR AND TRANSFER POINTS (IN PLANT) <br />Description of Controls for Conveyors: Covered over river <br />(Indicate on separate diagram if more than one conveyor system is involved) <br />• lumber of Transfer Points: <br />Description of Controls for Transfer Points: <br />Quantity of material conveyed: 50,000 tons/year maximum <br />STOCKPILE (FINISHED OR PROCESSED MATERIAL) <br />Cubic yds. or tons Of: N/A Coal; <br />Description of Controls: <br />Method of Loading into Pile: <br />Length of time stockpile remains undisturbed: <br />Description of Loadout: <br />Description of Controls: <br />Loadout Schedule: <br />LOADOUT FROM STOCKPILE FOR FINAL TRANSPORT <br />tons/hour <br />Rock; Other(describe) <br />hours/day <br />days <br />days/year <br />-3- <br />