Laserfiche WebLink
between the spillway elevation and the sediment level, then using the <br />stage capacity curve to determine if adequate sediment storage <br />capacity remains in the pond; by staking the sediment storage level <br />beneath the principal spillway elevation where the sediment storage <br />volume has been reduced to the volume discussed above and where <br />maintenance will be required on the pond; or by other acceptable <br />methods as directed by Peabody's professional engineer. <br />2.05.3(4} Ponds, Impoundments and Diversions <br />6. All references, either in the permit application text or on maps, <br />to the "proposed" 004 Pond should be deleted. Those portions of <br />the text, and applicable maps, should be revised to reflect <br />current mine status. <br />RESPOIJSE: <br />Pond 004 was constructed in 1982 and all previous reference to this <br />pond as being "proposed" is hereby deleted. All applicable maps are <br />revised to reflect the current mine status. <br />• <br />• <br />9 Revised 8/27/36 <br />