My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58057
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:22 PM
Creation date
11/20/2007 5:40:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005021
IBM Index Class Name
Permit File
Doc Date
4/8/2005
Doc Name
112c New Appl
From
Oldcastle SW Group Inc. dba Four Corners Materials
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table D-7 <br />Topsoil Storage <br />Mining Area Eastern Topsoil Berm <br />Berm Length 1,250 ft <br />Height of Berm 8 ft <br />Slope Ratio 3 <br />Berm Width 48 ft <br />Cross section area 192 sq ft <br />Volume 240,000 cu ft <br />Overburden Stockpile <br />The overburden from Phase 1 will be stockpiled to the south of the mining azea. Once enough of <br />Phase 1 has been mined out to start creating the peninsulas in the Reclamation Plan, this stockpile <br />will be rehandled and will create a portion of the peninsula shown in Phase 1. <br />5. Water Information. Rights and Au¢mentation <br />All water rights issues such as availability of water for this operation, consumption rates, dust <br />control, etc. is presented in Exhibit G -Water Information. <br />6. Schedule of Oneratious <br />Mining operations will only occur as dictated by demand up to the maximum rates described <br />earlier in the mine plan. Mining, screening and processing will take place year round and product <br />will be sold from this activity throughout the year, although little is expected to be sold in winter <br />months. The operator will not have night gravel mining operations, although minor truck activity <br />or repairs may occur after hours. Mining, processing and trucking will take place no more than 13 <br />hours per day, between the hours of 6 am and 7 pm, 6 days per week. <br />Anderson Pif February OS D-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.