2. Minin¢ Timetable <br />The following timetable is a best estimate of the sequence of operations for the life of the mine <br />after May 2005 and is based on mining and selling 252,500 tons of total product per yeaz (this is <br />less than the permit maximum rate of 378,750 tons/yr but is an expected average): <br />Table D-4 <br />Task # Description Time Needed <br />Months <br />1 Prepare sediment pond and collection <br />ditches. 0.5 <br />2 Strip topsoil from Staging Area and <br />Phase 1. Strip overburden from Phase <br />1. Store topsoil and overburden in <br />se azate stock files. 0.5 <br />3 Mine Phase 1. 40.7 <br />4 Reclaim Phase 1 and mine Phase 2. 36.8 <br />5 Reclaim Phase 2 and mine Phase 3. 35.0 <br />6 Reclaim Phase 3 and mine Phase 4. 32.1 <br />7 Reclaim Phase 4 and mine Phase 5. 38.1 <br />8 Reclaim Phase 5 and mine Phase 6. 35.3 <br />9 Reclaim Phase 6 and mine Phase 7, 38.8 <br />10 Reclaim Phase 7 and mine Phase 8. 40.4 <br />I 1 Reclaim Phase 8 and mine Phase 9. 33.0 <br />12 Reclaim Phase 9 and mine Phase 10. 31.1 <br />13 Reclaim Phase 10 and mine Phase 11. 34.3 <br />14 Reclaim Phase 11 and mine Phase 12. 36.9 <br />15 Reclaim Phase 12 and Staging Area. 3.0 <br /> Total months 437 <br /> Total years 36.4 <br />The mining schedule is planned to minimize disturbance by reclaiming areas as additional <br />mining is undertaken. Note: If large contracts are awarded to the site, production could increase <br />to the permit maximum, thereby curtailing the life of the pit. On the other hand, if contracts aze <br />Anderson Pit February OS D-6 <br />