Laserfiche WebLink
Table D-2 <br />Permit Area Description Acreage <br />1. Topsoil Berm along 1675 Road on western edge 1.63 <br />2. 100' Buffer to Hutchins Property 2.90 <br />3. 50' Buffer around remaining Property Perimeter 9.44 <br />4. Mining Phase 1 10.44 <br />5. Mining Phase 2 11.83 <br />6. Mining Phase 3 11.41 <br />7. Mining Phase 4 12.55 <br />8. Mining Phase 5 13.31 <br />9. Mining Phase 6 12.49 <br />10. Mining Phase 7 12.50 <br />11. Mining Phase 8 13.32 <br />12. Mining Phase 9 12.56 <br />13. Mining Phase 10 11.40 <br />14. Mining Phase 11 12.34 <br />15. Mining Phase 12 11.64 <br />Total Permit Area 159.76 <br />Note that the processing area will move during the mining of the Anderson Pit, so it has been <br />included in the areas described above. Map C-2 shows the various locations where the <br />processing facilities will be located throughout the mine life. <br />Mining will progress through the Phases numerically. The topsoil and overburden from a new <br />area will be used to reclaim the previous area as well as create the peninsulas which have been <br />previously described. This will reduce material moving as well as reduce the maximum area to <br />be reclaimed. Any fines from the crushing/screening operation will also be salvaged and used in <br />the reclamation. A table of expected mining lives for each Phase is included in Table D-3. The <br />life of each Phase is based on the anticipated annual averaee tonnage. <br />Anderson Pit February OS D-4 <br />