My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58057
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:22 PM
Creation date
11/20/2007 5:40:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005021
IBM Index Class Name
Permit File
Doc Date
4/8/2005
Doc Name
112c New Appl
From
Oldcastle SW Group Inc. dba Four Corners Materials
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table D-2 <br />Permit Area Description Acreage <br />1. Topsoil Berm along 1675 Road on western edge 1.63 <br />2. 100' Buffer to Hutchins Property 2.90 <br />3. 50' Buffer around remaining Property Perimeter 9.44 <br />4. Mining Phase 1 10.44 <br />5. Mining Phase 2 11.83 <br />6. Mining Phase 3 11.41 <br />7. Mining Phase 4 12.55 <br />8. Mining Phase 5 13.31 <br />9. Mining Phase 6 12.49 <br />10. Mining Phase 7 12.50 <br />11. Mining Phase 8 13.32 <br />12. Mining Phase 9 12.56 <br />13. Mining Phase 10 11.40 <br />14. Mining Phase 11 12.34 <br />15. Mining Phase 12 11.64 <br />Total Permit Area 159.76 <br />Note that the processing area will move during the mining of the Anderson Pit, so it has been <br />included in the areas described above. Map C-2 shows the various locations where the <br />processing facilities will be located throughout the mine life. <br />Mining will progress through the Phases numerically. The topsoil and overburden from a new <br />area will be used to reclaim the previous area as well as create the peninsulas which have been <br />previously described. This will reduce material moving as well as reduce the maximum area to <br />be reclaimed. Any fines from the crushing/screening operation will also be salvaged and used in <br />the reclamation. A table of expected mining lives for each Phase is included in Table D-3. The <br />life of each Phase is based on the anticipated annual averaee tonnage. <br />Anderson Pit February OS D-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.