7 Spread topsoil on reclaimed area and truck ramps 3 $2,942 <br /> from stockpile 3.6 acres @ 8 inch average thick- <br /> ness (3872 cy) Avg. push dist = 250 feet @ -2% <br /> grade. Use D-8 w/universal blade. Cost is <br /> $0.76/cy. <br />8 Final grading and harrowing of topsoil, upper 5 $1,471 <br /> zone only, (3872 cy @ $0.38/cy). <br />9 Seed & mulch wetland (0.52 acres @ $3500/acre) 2 $1,820 <br />10 Seed, mulch, fertilize (3.6 acres@ $1000/acre) 2 $3,600 <br /> Drill seed on flat azeas. Mulch at 30001bs per <br /> acre. <br /> Total Direct Costs 42 days $320,409 <br /> DMG Costs (19.5% z direct costs) $62,480 <br /> Total Bond Amount $382,889 <br />Worst Case Reclamation Costs and Timetable (After Substitute Water Supply Plan in Place) <br />This worst case assumes that the full 0.4 acres of wetland shelf will be created since the existing <br />pond will be mined. <br />The worst case will occur when Phase 1 is mined out with the outer slopes backfilled to 3H:1 V and <br />topsoiled, while Phase 2 has been stripped of topsoil. In this scenario, and a highwall width of 800 <br />feet in Phase 1 must be backfilled from 2H:1 V to 3H:1 V. For a height of 23 feet, this will require <br />the difference of 793 sq.ft (3:1) and 529 sq.ft. (2:1), which is 264 sq. ft. This area x 800 feet length <br />= 7822 cy. For the worst case, it will be assumed that Phase 1 will need to be dewatered. The Phase <br />2 acreage must be ripped, topsoiled and seeded. The shelf wetland of 0.40 acres must be created <br />and all topsoil must be replaced on the land from 5' below water level and above in a portion of <br />Phase 1 and all of the Phase 2 distwbed area. The entire topsoiled area would need to be seeded, <br />mulched and fertilized. This is an area of 3.9 acres. The stages of the reclamation plan and the <br />worst case reclamation costs are given below: <br />North Fork Pit Mazch 04 30 <br />