Laserfiche WebLink
o Bedding and riprap placement have been completed for full <br />length of Drainage 31-1. Placement looks good with adequate <br />thickness and good gradation. CYCC has achieved better <br />channel definition, although flow line still appears to be <br />elevated due to riprap size. Bower Bros. will work on <br />Drainage 31-2 to achieve better channel definition. Talked <br />with Bud Bower .about using excessive rock to buttress opposite <br />bank of 31-1 at confluence with side channel. <br />CORRECTIVE MEASURES NOTED <br />o Use excess rock to control flow velocities below Drainage 51. <br />o Carry bedding at full thickness to top of flow channel for <br />Drainage 51W. <br />o Improve channel definition for Drainage 31-2 and use excess <br />rock to buttress opposite bank at channel confluence. <br />