Laserfiche WebLink
Rockdust Distribution System <br />Mine Communications System <br />Personnel First Aid and Safety Equipment <br />Personnel Carriers <br />Shield Roof-Support Carriers <br />Supply Tractors and Trailers <br />Lubrication Trailers <br />Maintenance Equipment and Supplies <br />Front-End Loaders <br />Haulage Trucks <br />Dozers <br />Motor Grader <br />Water Truck <br />Boom Truck and Fork Lifts <br />Utility Trucks and Light Vehicles <br />Air Compressors <br />Welders <br />Generators <br />Light Plants <br />Pumps <br />EASTERN MINING DISTRICT <br />The same mining methods utilized at the existing Foidel Creek Mine will be used to mine coal from the Eastem <br />Mining District. The only difference will be that the longwal] panels will be much longer, i.e. approximately <br />10,000 - 17,000 feet in length as opposed to the current ones of approximately 10,000 feet. <br />• The existing surface facilities, including the bathhouse, offices, shops, coal stockpiling and handling systems, and <br />coal loadout will be used for mining coal from the Eastern Mining District. In order to accommodate the panels in <br />the eastern district, a new dewatering facility will be constructed and three fans will be installed. One of these fans, <br />the Zero Entry Fan, has been previously permitted. The location of these new systems is shown on Map 23, Mine <br />Plan, and also Maps 17 and 17A and Maps 18 and 18A, Premine Soils, and Premine Vegetation, respecfively. The <br />plans for these systems aze presented in detail in the following sections. Only one of the new fan sites will require <br />construction activities in an undistwbed area. The fan site will be located at the east end of the 9 Right longwall <br />panel, between the 9 and 10 Right gateroads. At this site, two fans will be installed and the associated stmctwes <br />will be constructed. <br />EMD (Panels 2 Right through 6 Right) (PR 97-04) <br />The same mining methods utilized in the Eastern Mining District (EMD) will be used to extract the coal from the <br />remainder of the EMD. The existing surface facilities, including the EMD ventilation sites, will be used for mining <br />of coal in the new five-year permit azea. Presently, no new surface facilities aze planned in support of the mining <br />That is to occw in the remainder of the EMD. <br />NMD (Panels 12 Right through 16 Right)(PR 99-OS~ <br />The same mining method utilized in the EMD will be used to extract coal from the NMD, except that the face width <br />is increased to 1,000'. The existing swface facilities, including the EMD ventilation site, will be used for mining of <br />coal in the NMD permit azea. <br />NMD -14 Right Gateroad Alternate Location (MR O1-171) <br />Currently, TCC is in the process of evaluating if the 1,000' wide face can be increased to approximately 1,200 feet <br />or wider. The outcome of the evaluation may limit the face width to something less than 1,200 feet. The existing <br />surface facilities, including the EMD ventilation site, will be used for mining of coal in the NMD permit azea. <br />MROS-194 2.05-11 07/2/05 <br />