Laserfiche WebLink
<br />36 Enterprises <br />Deakins Pit <br />July 21, 2001 <br />Exhibit "C" <br />MINING PLAN <br />a) Mining operations will begin upon approval of permit, July <br />2001 +/- with ending of phase II being the year of 2007 - <br />2008. <br />b) The pit sites (see exhibit "E-2") are expected to have 2' - 4' <br />topsoil/overburden. <br />c) No waste overburden is expected out of stripping of <br />topsoil. <br />d) Estimated 15' of pit run gravel to be mined at site. <br />e) Three major components of the operation will be to: <br />1. Construct an approach to first street (to <br />conform to county specs). <br />2. Office to be moved onto site. <br />3. 10' x 70' scales to be constructed in permit area. <br />4. Proposed process area at site will be covered with <br />10" of pit run gravel and graded so any drainage from <br />process area will be directed to return to phase I pit <br />f) Phase I disturbed area to be approximately 500' x 300', <br />Phase II disturbed area to be approximately 530'x 230' <br />and proposed process area, see exhibit "E - 2". <br />