Laserfiche WebLink
5. Spi11 response: In the event of an oil spill, which is contained within <br />the area, personnel will take action to insure that the oil is contained. <br />`- The owner will be notified and cleanup and facility repair activated. <br />If, through a series of unplanned events, oil does leave the containment <br />area, personnel will: <br />a. Take immediate action to contain oil, if possible, by using <br />sorbent materials, earthen beams, etc. <br />b. Notify the owner, who will notify <br />1. Fire Department 303824-6511 <br />2. EPA (24 hrs) (303) 837-3880 <br />3. State Health Dept. (303) 388-6111 <br />c. If owner cannot be reached, personnel will notify 1, 2, b 3 <br />above. <br />Should the spill exceed the capabilities of the personnel at the scene, <br />then some of the following contractors will be contacted: <br />Brasel and Sims <br />Coal Hine Road <br />e Craig, Colorado 81625 <br />(303) 824-9228 <br />(Construction Equipment) <br />Quillen Construction Company <br />11 West Victory Way <br />Craig, Colorado 81625 <br />(303) 824-9491 <br />(Construction Equipment) <br />Van Vators and Rogers <br />4300 Holly Street <br />Denver, Colorado <br />(303) 388-5651 <br />(sorbent Materials) <br />6. Amendments: This plan will be amended whenever a change in facility design <br />occurs. A review of the SPCC Plan will be conducted at least every three (3) <br />years. Minor changes in the Pian will De attached to the original Plan. <br /> <br /> <br />