My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57447
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:47 PM
Creation date
11/20/2007 5:27:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977245
IBM Index Class Name
Permit File
Doc Date
9/29/1977
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
._ <br />Surrounding Zoning: To the North - C-1 along Highway 285 and MR-2 <br /> further to the north <br />To the East - C-1 along Highway 285 and MR-Z <br /> south of the highway (C-1 zone <br /> district covers a strip along <br /> Highway 285 approximately 200' <br /> wide in this area) <br />To the South - A-2 zone district <br />To the West - MR-2 zone district <br />Surrounding Land Uses: To the North - State Highway 285 <br />To the East -Vacant <br />To the South - Vacant <br />To the lJest -Pine Road and residential uses <br />Future Land Use: The 1971 Mountain Areas Future Land Use Plan <br />recommends commercial uses on this site. <br />Compatibility: The existing rock quarry has low compatibility <br />with the existing surrounding land uses. However, <br />with proper reclamation and an after-use con- <br />sistent with the Comprehensfive Plan recommendations <br />and the zoning resolution, high compatibility will <br />be restored. <br />Operational Plan <br />Method of Operation: <br />~- ~~. <br />The basic method of extraction is lasting and rippin~j~to loosen <br />the material, followed by loading onto a~conveyor which runs the <br />aggregate through a screen. Bulldozers, front-end loaders and backhoes <br />are used to remove and load material and Ford tandem and single-axle <br />dump trucks are used to haul it away. <br />Blasting will be done at a maximum of once per week and all neigh- <br />boring commercial and residential sites will be notified in advance <br />of when blasting will occur. Charge size will not exceed 4,000 pounds <br />and delayed charo_es will be used to minimize damage due to ground <br />motion and sonic disturbance. <br />The quarry will operate from 8:00 A.M. to 4:30 P.M., Monday through <br />Friday. 1•leekend operations will be carried out only in emergency <br />situations such as floods. <br />Figure 3 shows the site details for that portion of the operation to <br />be governed by this report. The County's contract with the landowner <br />' expires July 31, 1976. The operational plan described in this report <br />will be effective for one (1) year from the date of approval by the <br />Board of County Conmissioners with the long-term operational and <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.