My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57317
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:41 PM
Creation date
11/20/2007 5:24:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
SECTION G ESTIMATED RECLAMATION TIMETABLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~e~,s~ 4-3o-gZ <br />ESTIMATED RECLAMATION TIMETABLE <br />u <br />• <br />• <br />The following is an estimated timetable for the reclamation <br />of the second and fourth stages of reclamation. The dates listed <br />are anticipated dates of completion for each stage of reclamation. <br />The mining of two seams in a syncline complicated by a steep limb <br />and several faults has dictated the proposed mining plan as well <br />as, the time lag of approximately one to two years for much of the <br />reclamation. Mining stages 4 through 9 will retrace much of the <br />area already disturbed during stages 1 through 3 in order to re- <br />cover the Sudduth coal seam (Plate 6). Due to this unconventional <br />mining sequence, cnrttemporaneous reclamation is unwarranted until <br />the second mining of each area has been completed. Reclamation will <br />advance simultaneously with the working face after completion of <br />Stage 4. See Plate 11 for the location and size of the area to <br />be reclaimed during each stage. <br />i <br />Equipment to be used in reclamation will be bulldozers, <br />scrapers, and graders Seedbed preparation and seeding and fer- <br />tilizing will require farm tractors, disc, harrow and drill seeders. <br />2nd Stage Reclamation <br />Estimated date of recontouring and topsoiling Aug. - Sept. 1982 <br />Estimated date of seeding Oct. - Nov. 1982 <br />Estimated acreage 3 acres <br />4th Stage Reclamation <br />Estimated date of recontouring and topsoiling Aug. - Sept. 1986 <br />Estimated date of seeding Oct. - Nov. 1986 <br />Estimated acreage 14.2 acres <br />G-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.