Laserfiche WebLink
Revised March 14, 1986 <br />ESTIMATED RECLAMATION TIMETABLE <br />Walden Coal is currently actively backfilling the entire pit. It is <br />expected that backfilling, grading, topsoiling, and revegetation will <br />be completed by the end of 1988. <br />• <br /> <br />G-1 <br />