Laserfiche WebLink
TABLE 4 <br />Projection of 2007 - 2008 Water Consumption from Mining <br />Loveland Ready -Mix Concrete, Inc. - Bokelman / Walters Pit <br /> <br />Month Production <br /> <br />(Ton) <br />1 Consumption <br /> <br />(Gallons) (ac-ft) <br />2 3 <br />September 20,000 [92,000 0.59 <br />October 19,000 182,400 0.56 <br />November 19,800 190,080 0.58 <br />December 12,800 122,880 0.38 <br />January 8,000 76,800 0.24 <br />February IQ000 96,000 0.29 <br />Mazch 14,000 134,400 0.41 <br />April 19,400 186,240 0.57 <br />May 19,000 182,400 0.56 <br />June 19,000 182,400 0.56 <br />July 18,800 180,480 0.55 <br />Au ust 20 000 192 000 0.59 <br />Total 200 000 1 918 080 5.89 <br />RECE1VEt1 <br />1=EB ©9 200"1 <br />WATER r.E&OURGEi <br />STATE ENUINEEH <br />coo. <br />Notes: <br />[1] Based on information from Loveland Ready Mix. Monthly production values aze estimates <br />and may vary so long as annual consumption is not exceeded. <br />[2] Water removed with mined aggregate equals 9.6 gallons/ton (4%). <br />[3] Equal to [2] divided by 325,851 gallons per ac-ft. <br />Aggegate will be processed at off-site location. <br />Dust control water will come from alternate location. <br />H:\9(dl - luvclvq Rcady Mu101 SSP3005 Malysis.nta <br />Workshmc Tebh4 aivhop-amgdcn. ACwcurcv. Ice. B:d6 AM L82Wt <br />