Laserfiche WebLink
~E~ic~tl~C- <br />TABLE 3 FEB ~ 9 207 <br />Maximum Evaporation In the Event Dewatering is Discontinued Prematurely <br />Loveland Ready -Mix Concrete, Inc. - Bokehnan / Walters Pit <br />WAVER RESOURCES <br />STAVE ENAIWEER <br /> <br /> <br /> <br />onth <br />PICI Maximum <br /> <br />Surface Area <br />(acres) <br />I Gross <br /> <br />Evaporation <br />Ra[e <br />(ft) <br />2 Total <br /> <br />Precipitation <br />Rate <br />(ft) <br />3 Effective <br /> <br />Precipitation <br />Ra[e <br />(B) <br />4 Net <br /> <br />Evaporation <br />Rate <br />(ao-ft) <br />5 <br />Net <br /> <br />Evaporation <br />(ac-ft) <br />6 Evapomtion <br /> <br />Lagging <br />pattern <br />(ac-fi) <br />7 Lagged eP- <br /> <br />Evaporation <br />Depletion <br />(ac-fQ <br />8 <br />September 9.40 0.33 O.13 0.09 024 2.23 ', 1 L66% 2.55 <br />October 9.40 0.23 0.09 0.06 O.I7 1.56 8.71°.6 1.90 <br />November 9.40 0.13 0.06 0.04 0.09 0.83 '' 7.1096 L55 <br />December 9.40 0.10 0.04 0.03 0.07 0.66 5.30% 1.16 <br />January 9.40 0.10 0.04 0.03 0.07 0.68 4.84% 1.06 <br />Febmary 9.40 0.11 0.04 0.03 0.09 0.82 ' 4.66°6 1.02 <br />March 9.40 0.18 0.11 0.07 O.II 1.00 ', 5.12°6 1.12 <br />April 9.40 0.29 0.16 0.11 0.18 1.73 6.59% 1.44 <br />May 9.40 0.39 0.25 0.18 0.22 2.02 7.8496 1.71 <br />June 9.40 0.47 O.I7 O.I2 0.36 3.35 ILI1% 2.43 <br />July 9.40 0.49 0.14 0.10 0.39 3.69 13.28% 2.90 <br />Au ust 9.40 0.44 0.14 0.10 0.35 3.25 13.79% 3.01 <br />Total 3.27 1.35 0.45 2.32 21.84 100.00°.6 21.84 <br />Notes: <br />[I ] Mazimum exposed surface area in the event that dewa[ering is discontinued prematurely. <br />[2] Based on NOAH Evapomtion AOas and distributed according to SEO Senate Bill 120 criteria for less than 650 <br />[3] Based on average of 1949 to 2002. Waterdale Station (IDp6839). <br />[4] Effective precipitation equal [0 70~ of mtal precipitation, [3]. Based on guidelines of SEO Senate Bill 120. <br />[5] Equal to gross evaporation rate. [2], less effective precipitation rate, [4]. <br />[6] Equal to total exposed surface area, [1], times net evaporaton rate, [6]. <br />[7] Based on CSU A WAS Glover Analysis; T=50000 gpd/f[, S =0.20, D = 750 ft for net evaporation resulting from PI C 1, assuming steady slate <br />wndiuons. <br />[8] (7] times the total of column [6]. <br />LRM requests that in the evem that dewatering of the Phase 1 pit is discontinued prematurely that they be able to reduce the amount of free water <br />surface and resulting depletion augmented as tue amount of water contained by the slurry wall decreases. <br />uweu. mwi,m air wraw~ svnzoos nrar~.w <br />w~na,a.: usi. r auuya~,Ra.o. n.wann, r,.. van nwr varzoor <br />