Laserfiche WebLink
<br />Larry Oehler - 2 - <br />5. The Division requests that ZMK Mining, Inc. commit <br />channel survey prior to mining, annually at the end <br />season, and during final reclamation to verify that <br />excavation is less than or equal to ten (10> feet. <br />be submitted to the Division within 30 days. <br />March 16, 1992 <br />to conducting a stream <br />of each mining <br />the depth of <br />Survey results should <br />6. The Division requests that ZMK Mining, Inc. provide engineering designs <br />for culvert installation prior to mining in the Phase II area and also a <br />discussion of their ability to handle the flows in the Uncompahgre River <br />during the period(s) when they will be in service. <br />TAS/s~ <br />1985E <br />