Laserfiche WebLink
- <br />inch culverts to replace the existing 18 inch culverts. Under the ends, where the water <br />would exit, 6 inches to 10 inch rip rap would be placed on the slopes immediately around <br />the entrance and exit of the culverts. <br />VII Exhibit H: <br />a: Tree and shrub guards will be used, to the extent practical. Trees and shrubs will be <br />monitored by PK Enterprises Inc. and the United States Forest Service. Perimeter fencing <br />will be removed when final reclamation has been achieved. <br />Detention ponds and drainage ways will stay in place, but may change location or size to <br />better fit the final reclaimed slopes. Location and size will be determined by the United <br />States Forest Service and PK Enterprises. <br />VIII Exhibit I: <br />a: For the most part we are to have 3:1 slopes except for bare rock areas or at the back of <br />the small planting areas where if the slope cannot hold topsoil, 6 to 10 inch rip rap will be <br />used. <br />XX Exhibit L: <br />Per your conversation with Pete Kuyper on September 20, we agree with the 80% of the <br />total cost on the work sheet you sent us. We arrived at this because there are 8.5 acres <br />already disturbed with only 6 acres to be disturbed from new mining activities. <br />XXII Exhibit S: <br />All property owners have been notified about this application and we have the original <br />receipts from certified mail on file. <br />Berhan, thank you again for your time and consideration in this matter. Should you have <br />any questions or comments please feel free to contact me at (719) 687-601 1. <br />~ncerely, j <br />~~ <br />,:G~~6ry A. Lo p <br />GAL/dkf <br />gravulladcyuacv.art. wpd <br />