Laserfiche WebLink
<br /> <br />Susan Burgmaier <br />September 29, 1993 '`' <br />Page 2 <br />Date: May 7, 1993 <br />Weather: Cold, rainy, windy <br />This was an inspection of the entire loadout facility. <br />Persons in attendance were: Larry Routten, Steve Wathen, Juan <br />Garcia (Colo-Wyo), Dennis Jones, Chuck McCUlloh, and me. The <br />purpose of this inspection was to note any problems with the <br />facility, especially the hydrologic structures. The Truck Loop <br />Pond appeared to be functioning properly. The DMG required that <br />the diversion leading to the pond be riprapped at the pond <br />location. This was subsequently completed. No other problems <br />were noted with this pond. <br />Dennis Jones made a visual observation of the Rail Loop <br />Pond during this inspection with DMG personnel. No problems <br />with this pond were noted. <br />Should you require any additional information, please contact <br />me. <br />Sincerely, <br />Thomas Wainwright, P.E. <br />Senior Engineer <br />bd <br />c: Fred Fest <br />Dennis Jones <br />