Laserfiche WebLink
• sheet 1 of 2 <br />CIRCES Cost Estimatilta Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 057 State :Colorado Permitllob # : G1982-057 <br />Date : 08/152005 County :Roufl Abbreviation :none <br />User : JRS Site :Seneca li-W Filename : C057-057 <br />Permit or other job action :Permit Renewa109 <br />Task description :Replace Topsoil from Stockpl/e BB to Permanent Road A <br />HOURLY EQUIPMENT COST <br />Description <br />Shift basis : 1 Pei day <br />• <br />Scraper work team -Scraper Cat 637G wyush pull <br />-Push dozer <br />Support equipment -Load area : A <br />-Dump area • NA <br />Road maintenance -Moror grader~CAT 14H _ <br />-Water truck Water Tanker, 10,000 Gal. <br />Cost Bra <br />akdown : Scraper Wark Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water trudr <br />Import data filename • scraper2 NA NA NA grader miso6uk <br />% Utilization•machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $76.44 NA NA NA $34.94 $56.94 <br />Operating cosUhour : $188.38 NA NA IIfA 510.59 $23.44 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cosUhour . $32.15 NA NA NA $31.97 $21.16 <br />Unit suMotals : $274.97 NA NA NA $77.50 $101.53 <br />Number of units : 4 0 0 0 1 t <br />Group subtotals : Work : $1,099.87 Support : $0.00 Maintenance : $179.04 <br />Total work team cost/hour : $1,278.91 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 2,545 LCY factor NA <br />Loose <br />volume : 2,545 LCY <br />• Source of quantity take-oft :Table 2t-3 <br />Source of estimated swell factor : NA <br />