Banks and Gesso, LLC <br />areas to be worked at one time and the timeframe for mining and reclamation activities <br />(see Exhibit C-3 for further details): <br />Table 1 -Operations Timetable <br />Phase Duration <br />ears Phase to be <br />Mined Area to be <br />Mined acres Phase(s) to be <br />Reclaimed <br />1 5 1 23.5 None <br />2 5 2 29.1 1 <br />3 5 3 25.7 1 &2 <br />4 5 4 28.6 1,2&3 <br />5 5 5 28.5 1,2,3&4 <br />6 2 None None 1,2,3,4 & 5 <br />Phase 1 <br />The Applicant will strip topsoil and overburden from the phase area. Topsoil will be used <br />to erect screening berms along the east, west, and north (along LaSalle Road) phase <br />boundaries. Overburden will be temporarily stockpiled on the northern end of the Phase <br />2 area for later use in reclamation effort of the Phase 1 area. Next, the processing <br />plants will be initially erected on the site in the approximate locations depicted on Exhibit <br />C-3. Mining will then begin on the northern edge of the phase area. Simultaneously, the <br />clarification and settling ponds will be constructed in the southern Phase 2 area, as <br />shown on Exhibit C3, and the pumping systems for use in aggregate washing will be set <br />up. Excavation will then proceed north to south until the pit edge reaches a point near <br />the plant, at which time stripping of Phase 2 areas will begin. Once an area large enough <br />for the plant to occupy is created, the plant will then relocate to that area in Phase 2, <br />which will allow the area underneath the initial plant location to be mined out. Sand and <br />gravel extraction will occur at 3:1 slopes. <br />The processing facilities will be moved on site in 2003, once all appropriate permits are <br />obtained. Topsoil stripped from Phase 1 will be approximately 19,000 CY and <br />overburden stripped will equal approximately 152,000 CY and will be stockpiled for later <br />use in reclamation. Approximately 2.5 million tons of sand and gravel will be extracted <br />during Phase 1 operations. Phases 1 is expected to last approximately 5 years. <br />Haldorson Sand and Gravel Mine <br />Haldorson and Sons, Inc. <br />April 2003 <br />7 <br />