Laserfiche WebLink
The impoundments have the following estimated capacities: <br />{MPOUNDMENT CAPACITIES -ACRE FEET <br /> Water Sediment Total <br />Pond B 4.10 0.46 (75% 0.62) 4.56 <br />Pond C 3.47 0.34 (75% 0.46) 3.81 <br />Pond D 0.48 0.07 (70% 0.10) 0.55 <br />Pond J 1.32 1.16 (100%) 2.48 <br />Pond K 0.49 0.18 (80% 0.22) 0.67 <br />Pond F 3.51 0.40 90% 0.44 3.91 <br />Notes: <br />1. The capacity of Ponds B and C are shown on Maps 22-B and 22-C respectively. <br />2. The capacity of Pond D was certified by the undersigned on 12-30-97. <br />3. The capacity of Ponds J and K were certified by the undersigned on May 29, <br />2002. <br />4. The capacity of Pond F was certified by the undersigned on July 1, 2004. <br />With the exception that Pond B~ Id be dewatered, to the best of my knowledge <br />and belief, the impoundme~~Q~ _ca~°~~intained as designed and in accordance <br />with the approved plan an~.~~ficable r~gGl~ions. <br />Stover ~ ^•;+ Date <br />siona engineer <br />~1923ST° <br />