My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25095
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:56 PM
Creation date
11/20/2007 5:16:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Hydrology
Doc Date
4/11/2007
Doc Name
2007 Annual Impoundment Inspection
From
J.E. Stover & Associates Inc
To
DRMs
Permit Index Doc Type
Prof Pond Certifications
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWIE RESOURCES, LLC <br />BOWIE NO. 2 MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundments located at the Bowie No. 2 Mine. <br />On March 21, 2007 I performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the ponds have a <br />potential for failure. There was no appearance of erosion, instability, structural <br />weakness or other hazardous conditions. There are no required monitoring procedures <br />or instrumentation other than monthly and yearly inspections. There are no aspects <br />which might affect stability. <br />Pond B had a pool of water about 4-feet below the emergency spillway at approximate <br />elevation of 5948, six feet deep. Because of the water level in the pond, it is not <br />possible to determine the sediment level. It is estimated that Pond B has about 25% of <br />its sediment capacity remaining. Pond B should be dewatered. <br />The water level of Pond C was about 3-feet below the elevation of the emergency <br />spillway at approximate elevation of 5997, 7-feet deep. Because of the water level in <br />the pond, it is not possible to determine the sediment level. It is estimated Pond C has <br />had a 25% sediment build-up since it was cleaned out. Pond C was being dewatered at <br />the time of the inspection.. <br />Pond D had a pool of water standing 6" deep well below the elevation of the primary at <br />approximate elevation of 5973. It is estimated Pond D has had a 30% sediment build- <br />up since it was cleaned out. <br />Pond J was dry to damp with no apparent sediment build-up. Pond K was damp to <br />muddy with an estimated 20% sediment build-up. <br />Pond F had about 2 foot of standing water at approximate elevation 5946 with an <br />estimated sediment build-up of 10%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.